RapidRide I Line construction update (November 2026)

“It’s Electric!” King County Metro celebrates its 100% battery electric bus base

Tukwila Base is home to 120 buses “fueled” by electricity, a renewable energy source.

It is a state of the art facility that has already become a blueprint for other transit agencies from around the country to emulate. It’s the only 100% battery electric bus base in Washington and one of the largest in the country.

Representatives from the companies that helped build Tukwila Base joined Metro staff to celebrate the end of construction and delivery of bus service out of the base.

At the Nov. 4 celebration, Metro General Manager Michelle Allison was joined by a number of companies that helped build Tukwila Base. From McKinstry, the general contractor, to the companies that helped design and procure the infrastructure that charges the buses, to the manufacturer that built the battery electric buses now in service, this was their chance to see how their parts of the project are working together to power the facility and provide bus service to our community.

“Metro is lucky to be part of a county that is a national leader in reducing greenhouse gas and its impact on our climate. A deep thank you to the construction companies and agencies who helped build this base so we can follow through on our climate commitments,” Allison said. “Tukwila Base is the future of clean, regional transit, that delivers service to our riders every day and is the next step in our journey toward completely zero-emission bus service.”

Learn more

Local students learn the ins and outs of transit through Metro’s Youth Transit Summer Internship

For three weeks this summer, 14 teenagers from around King County participated in Metro’s fourth annual Youth Transit Summer Internship.

The program provided an opportunity for the young people to learn about transit, engage with our frontline staff and local community, paint a bus shelter mural, explore careers, and develop social media content. They also provided great input to Metro about how to improve our transit messaging for young people.

This year’s cohort had strong connections to south King County and came from a wide range of backgrounds, including immigrant, multilingual, and multigenerational households, with varying levels of experience riding transit in their communities. Interns had a diverse set of interests including robotics, business, engineering, graphic design, environmental science, urban planning, textile arts, and more.

Learn more

RapidRide I Line is coming to Renton, Kent and Auburn

King County Metro is building 17 miles of new RapidRide service in Renton, Kent, and Auburn. Once I Line is in service it will provide connections to the Renton Transit Center, Kent Transit Center and Auburn Station. The I Line will also connect riders to the RapidRide F Line, Sound Transit buses; Sounder Train; and local bus service, making it easier for people to travel to and from regional destinations and access a network of local bus routes. Metro is building RapidRide I Line to meet a critical need for improved north-south transportation options in south King County. Visit our website to check out our interactive map and learn about the passenger stations, and other improvements this project will bring!

What to expect during construction

Construction activity, mainly along roads and sidewalks, is underway. Typical work hours are Monday through Friday, 7:00 am to 5:00 pm, with some nighttime and weekend work. Construction may cause temporary changes or disruptions to your usual access or travel patterns along the RapidRide I Line route. The contractor will work in designated construction zones with potential temporary local impacts over the course of the project.

During construction, you can expect:

  • Temporary parking restrictions
  • Periodic lane and driveway closures
  • Large machinery and truck activity
  • Construction staging and parking impacts near some construction sites
  • Some sidewalk, intersection, and lane closures
  • Detours for people walking, biking, and rolling
  • Temporary bus detours and bus stop relocations for Route 160 and other area transit and bus routes.
  • Flaggers to direct traffic around work areas

Learn more

Businesses are open and safety reminders

Businesses remain open during RapidRide I Line construction. While the area may experience temporary changes in appearance and accessibility, businesses and services remain fully operational and ready to welcome customers. You will also see “Business Open During Construction” signs to help guide customers to nearby business locations.

When traveling near I Line construction areas, please stay alert to changing conditions. Work zones can shift daily, so it is important to watch for updated traffic patterns, signage, and the presence of drivers, pedestrians, and people biking or rolling. Construction along this corridor will continue through 2027, which means ongoing activity and potentially increased traffic.

Please follow all crew instructions, posted signs, and guidance from flaggers, whose role is to help keep both travelers and workers safe. Your attentiveness, patience, and courtesy help ensure that everyone in the public right‑of‑way can return home safely each day.

RENTON

SE Carr Rd & 105th Pl SE

Work occurring November 10-11 (south side of 105th Pl SE)

  • Landscape preparation

 Talbot Rd S & Valley Medical Center

Work occurring November 10-30 (east side of Talbot Rd S)

  • Install light pole foundations and shelter footings
  • Install wall footing and retaining wall

S Grady Way & Talbot Rd S

Work occurring November 9-20 (north side of S Grady Way)

  • Underground electrical boring work

KENT

Central Ave S & S 266th St

Work occurring November 6-12 (east side of Central Avenue S)

  • Dig electrical trench across roadway

108th Ave SE & SE 200th St

Work occurring November (east side of 108th Ave SE)

  • Install bus shelter frame and glass

104th Ave SE & SE 228th St

Work occurring November 6-18 (east and west sides of 104th Ave SE)

  • Install light and signal poles (east)
  • Install bus shelter frame and glass (west)
  • Install sidewalk (east)
  • Prepare for landscaping (east)

 108th Ave SE & SE 216th St

Work occurring November 6-30 (west side of 108th Ave SE)

  • Prepare for shelter footing installation
  • Underground electrical work
  • Install sidewalk, curb, gutter, and shelter footings

104th Ave SE & SE 248th St

Work occurring November 6-30 (west side of 104th Ave SE)

  • Bus shelter installation and wrapping
  • Install sidewalk, curb, gutter, and driveway paving

 104th Ave SE & SE 235th St

Work occurring November (east side of 104th Ave SE)

  • Prepare sidewalk grade

Central Ave S & E Meeker St

Work occurring November 6-11 (west side of Central Avenue S)

  • Install curbs and bollards

104th Ave SE & SE 256th St

Work occurring November 6-30 (west side of 104th Ave SE)

  • Remove asphalt for electrical work
  • Prepare for installing shelter footings and electronic signpost
  • Underground electrical work
  • Install curb, gutter, sidewalks, and driveway

 104th Ave SE & SE 240th St

Work occurring November 11-30 (east side of 104th Ave SE)

  • Set up traffic control
  • Sawcut and remove sidewalk
  • Begin wall construction

102nd Ave SE & SE 239th St

Work occurring November 11-30 (north side of 239th St SE, east of 102nd Ave SE)

  • Set up traffic control
  • Install drainage

AUBURN

Auburn Way N & 22nd St NE

Work occurring November 6–10 (east side of Auburn Way N)

  • Bus shelter installation and wrapping

 Auburn Way N & 2nd St NE

Work occurring November 6–13 (west side of Auburn Way N)

  • Bus shelter installation and wrapping

 Auburn Way N & 42nd St

Work occurring November 6–9 (east side of Auburn Way N))

  • Bus shelter installation and wrapping

Auburn Way N & 10th St NE

Work occurring November 6–12 (west side of Auburn Way N, south of 9th St NE)

  • Bus shelter installation and wrapping

 Auburn Way N & 49th

Work occurring November 6–16 (west side of Auburn Way N)

  • Install sidewalk and curb section

 Auburn Way N & 15th St NE

Work occurring November 6–30 (east side of Auburn Way N)

  • Traffic control set up and sidewalk demolition and removal
  • Electrical underground work
  • Prepare for sidewalk replacement
  • Prepare for landscaping
  • Prepare for installing shelter footings

Community Highlights

Renton

Museum Tree Lighting
November 28 | 5PM to 6:30PM | Renton History Museum

Join us for hot cocoa, ornament making, and holiday cheer at our annual Tree Lighting event at the Renton History Museum!  Learn more.

Kent

Winterfest in Kent

December 5 | Start Time 2 PM | Town Square Plaza

Welcome winter with the Winterfest tree lighting and parade on 12/5 starting at 2 PM!  Activities occur throughout the month, so be sure to check out the full schedule of entertainment and events on the Kent Parks website.

Auburn

December 14 | Voting Happening 12/1-12/12 | Auburn Community Center

This fun event celebrates the holidays and brings the community together to see what Auburn can build! Gingerbread structures will be on display at the Auburn Community & Events Center with voting happening between 12/1 and 12/12. Winners will be announced on 12/14. Learn more.

Leave a Reply